The 37 acres of land that was once home to 25 petroleum tanks and 20 acres of contaminated soil, is now an award winning project and home to hundreds of new residents.
View the full article on Nerej
The 37 acres of land that was once home to 25 petroleum tanks and 20 acres of contaminated soil, is now an award winning project and home to hundreds of new residents.
View the full article on Nerej













July 23, 2026 Every adaptive reuse project comes down to a handful of make-or-break variables: existing conditions, floor plate configuration, location, financing, and how a

July 23, 2026 Adaptive reuse has become the darling of the DC development world. It’s easy to see why: an excess of unutilized, vacant Class B and Class C office space, combined with major incentive programs like

Construction on the 20-story tower is expected to begin late next year. A Carrollton real estate firm founded by a former SMU football player aims to build a